Pat's Log
Sat, 28 Mar 2009

Boat Day!
20090328 On the Friday leading up to my birthday weekend, I decided to take the day off and catch up on hobbies. I got loads done on my 1:12 scale Trojan cruiser, to the point that the end is in sight.

After twelve hours at the shop, cutting and epoxying the individual teak planks, then sanding old paint off the superstructure, I came home, only to put myself through another arduous task: creating railing joints. After a fair bit of work, I got one of them done. Not to be outdone by the urge to sleep, I decided to do the other thirteen as well. The railing is 1/16" rod, so the joints are really quite small.

And that's how the eve of my birthday went.


[] | posted @ 05:58 | link

copyright ©2004-2016 pat suwalski